In this first report on subtask 4.1, an introduction is given to the
general concepts of testing digital circuits. This testing primarily focuses
on volume production. The introduction indicates the need for structural
testing during production of digital circuits. The principle of Boundary
Scan Test (BST), as described in the JTAG V2.0 document, is studied for
its applicability in several areas of testing. Also the hierarchical structures
encountered in systems are studied. The principal discussions are relevant
for a wide range of digital products but the remainder of this report mainly
deals with board level tests.
To be able to use BST, one has to understand the circuitry under test.
The possible faults that can occur are therefore modelled in the second
chapter, before deriving a strategy that will detect all possible faults.
Also the technology dependency that gives problems in fault detection is
discussed. Finally, in the last chapter, the actual protocol for testing
with full BST is given, starting with testing the on-board BST infrastructure
itself. This chapter shows the BST test sequence to be followed and gives
an idea about the test times involved.
Índice:
1 – INTRODUCTION
2 – BOARD TESTING WITH JTAG V2.0
PCB testing
Conventional test methods
Modern products and testability
Quality in production
Towards process control
JTAG applicability for PCB testing
Components test
Structural test
Functional test
Hierarchical structures
Multiple TAP testing
Board level self test
Concluding remarks
3 – FAULT MODELLING FOR FULL BST
Manufacturing faults
Technology dependency
Completeness of fault detection
The fault model
About shorts
About opens
Remarks on TPG
Example
Test patterns
Diagnosis
Multiple fault diagnosis
4 – TEST PROTOCOL FOR FULL BST
Test considerations
Remarks on net definition and modelling
Testing the BST infrastructure
Extended reset
Check of the BST daisy chain
Shifting through the BYPASS register
Example 1: Check using BYPASS registers
Shifting through the INSTRUCTION register
Example 2: Check using INSTRUCTION registers
Check available IDENTIFICATION registers
Testing interconnects
Board topology
Conversion after TPG
Diagnostics
Test sequence
5 – CONCLUSIONS
6 – PROJECT STATUS AND PROGRESS
REFERENCES
|